Ian's R​V-14A Project

A diary of building an Experimental Amateur Built Aircraft,
the Van's RV-14A

Welcome to my Blog

I try to explain what I've done and any significant problems or milestones.
​I'll leave it to the videos to show the work.

Building on hold....

14/5/2018

1 Comment

 
I know it's been some time since I posted anything, so I thought I'd update the blog.

Unfortunately the building of my project has been put on hold as I've been working in New Zealand since October 17. I am missing it a lot and wish I could have it here with me.

Unfortunately, must have income to continue to build and fly, so the job must come first. Should the job here become full time I'll consider moving it here but for now it's sitting on shelves and in crates.

Hope to be back to building as soon as possible.
1 Comment

Horizontal Stabilser Finished...

20/7/2017

1 Comment

 
After getting the ok from Vans about the dimples, i proceeded to remove the 10 rivets for the fairing. Removed a couple of other rivets that I wasn't happy with as well.

Inserted the 10 rivets on the other side and the unhappy ones and then I was happy. The horizontal stabiliser was finished as per the plans section 8.

On the wall it went.

Now to the elevator.
Picture
1 Comment

More HS Riveting....

17/7/2017

0 Comments

 
John Butler came around again today to help what we hoped would be the end of the horizontal stabiliser.

Well, we riveted the final section of skin and made a few errors again so more rivets needed to come out. 

We cleco'd the rear spar in place then I realised there were amendments to the plans on the Van's website. These dealt with the incorrect installation of the front spar. Well guess what? I had my front spar orientated the wrong way. We thought about it and thought we would have to drill out all the rivets and then redo the whole skin. Eventually, I thought if we just put the rear spar in the other way (as it's all symetrical), I would only have to drill out 10 rivets as this made what was the bottom to now be the top. On the top skin I needed to leave open 10 holes to attach the fairing later on. 

So we went ahead and rivetted the rear spar in place. I then confirmed with Van's that it was ok to remove those rivets and that the dimpling won't be a problem. They confirmed all ok.

​
0 Comments

Passed my test......

14/7/2017

0 Comments

 
Passed my Flight Instructors Rating. Now to more building......
Picture
0 Comments

Back from a break

13/7/2017

0 Comments

 
Well I went away on an overseas trip to see the Red Bull Air Race in Chiba, Japan and to my best friends wedding in Manila, Philippines. After getting back I concentrated on my Flight Instructors Rating and Australian Air Force Cadet flying camps, so no work done in June.

I had been working/studying pretty intensely for the Flight Instructors Rating and the test is tomorrow so I wanted to have a day of doing something completely different. So building was the go.

John Butler came around again and we continued the riveting of the skins to the horizontal stabiliser. This is definitely a two person job. We made a few errors that required drilling out the rivets but that's not too much of a problem.
​
0 Comments
<<Previous

    RSS Feed

    Archives

    May 2018
    July 2017
    May 2017
    April 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    July 2016
    June 2016
    May 2016
    March 2016
    February 2016
    January 2016
    September 2015
    August 2015

    Categories

    All
    03. Tools And Workshop
    04. Parts
    05. Construction Materials
    06. Vertical Stabiliser
    07. Rudder
    08. Horizontal Stabiliser
    09. Elevator
    10. Aft Fuselage
    11. Empennage Attachments
    12. Empennage Fairings
    13. Main Spar
    14. Wing Ribs
    15. Rear Spar
    16. Top Wing Skins
    17. Outboard Leading Edge
    18. Fuel Tank
    19. Wing Systems Routing
    20. Bottom Wing Skins
    21. Flap
    22. Aileron
    23. Aileron Actuation
    24. Wing Tip
    25. Fwd Mid Fuselage Bulkheads
    26. Mid Fuselage Lower Structure
    27. Firewall
    28. Fwd Fuselage Lower Structure
    29 Fwd-Mid Fuselage Side Structure
    30. Aft Fuselage Attachment
    31. Fuel System
    32. Baggage Area
    33. Rudder And Brake System
    34. Flap Actuation System
    35. Upper Fwd Fuselage
    36. Aileron & Elevator Systems
    37. Roll Over STructure
    38. Canopy & WIndow
    39. Seatbacks
    40A. Tricycle Landing Gear & Engine Mount
    41. Wing Attachment
    42. Miscellanea
    43. Engine Installation
    44. Spinner & Propeller
    45. Cowling
    46A. Tricycle Gear Leg & Wheel Fairing
    47. Cowl Baffle
    48. Exhaust System
    49. Fuel & Oil Systems
    50. Control Cables
    51. Antenna Installaion
    52. ACK ELT
    Aft Fueselage Kit
    Avionics Kit
    Electrical
    Empennage Kit
    Finishing Kit
    Inspections
    Miscellaneous
    OP-38. Aileron Trim
    OP-52. Landing Light
    OP-55. WIngtip Navigation Lighting
    OP-56. Tail Lighting
    Paint
    Powerplant Kit
    Priming
    Wing Kit

  • Blog
  • About
  • Contact
  • Hours
  • Helpers