A diary of building an Experimental Amateur Built Aircraft,
the Van's RV-14A

Welcome to my Blog

I try to explain what I've done and any significant problems or milestones.
​I'll leave it to the videos to show the work.

Manufacture part...

9/10/2020

0 Comments

 
Had to manufacture a new part (E-1008B Rib) to replace the one that I had made an error on. Thankfully VANS were able to send me a plan of the part with all dimensions rather than sending me a new part and the associated exorborant freight costs.  I had plenty of aluminium sheet so I was able to make the part.
​
0 Comments

Final Practise Project

9/3/2016

0 Comments

 
Picture
Built the Vans practise flap kit to continue with some practising before I get into the real thing. The flap section actually looks like the real thing so it helps get ready.

Not sure I'm still happy with riveting especially in the hard to reach spots in the ribs. You can see the bends in the edge. Won't be doing that on the actually aircraft.

​Alodine looks a bit better though.

Picture

0010-Ians RV14A-FlapSection from Ian Reilly on Vimeo.

0 Comments

Another Practice Project

25/2/2016

0 Comments

 
Picture
Completed the Vans practice Tool Box today.

Still need practice with riveting I think. Most were good but one or two didn't turn out too well. Tried a few different methods as well. The Pneumatic squeezer will need much more practise I think.

Did some practise with the Alodine. A bit patchy. Not sure if this the Alodine process or the Alumiprep. Not sure how much I should be "roughing" up the Aluminium. Noticed there were still patches of muck from the blue plastic and images from the red labelling.

Open to any help with this. Suggestions or tips on what is best. How long to leave in Alumiprep etc.


0 Comments

Category Numbers

6/8/2015

0 Comments

 
Category numbers reflect the numbering of the sections of the Van's Builders Manual for each of the specific items.

EMPENNAGE / AFT FUSELAGE KIT​
 - 6. Vertical Stabiliser
 - 7. Rudder
 - 8. Horizontal Stabiliser
 - 9. Elevator
 - 10. Aft Fuselage
 - 11. Empennage Attachments
 - 12. Empennage Fairings
 - OP56. Optional Tail Lighting

WING KIT
 - 13. Main Spar
 - 14. Wing Ribs 
 - 15. Rear Spar
 - 16. Top Wing Skins
 - 17. Outboard Leading Edge
 - 18. Fuel Tank
 - 19. Wing Systems Routing
 - 20. Bottom Wing Skins
 - 21. Flap
 - 22. Aileron
 - 23. Aileron Actuation
 - 24. Wing Tip
 - OP38. Optional Aileron Trim
 - OP52. Optional Landing Light
 - OP55. Optional Wing-tip Navigation Lighting

FUSELAGE KIT
 - 25. Forward-Mid Fuselage Bulkheads
 - 26. Mid Fuselage Lower Structure
 - 27. Firewall
 - 28. Forward Fuselage Lower Structure
 - 29. Forward-Mid Fuselage Side Structure
 - 30. Aft Fuselage Attachment
 - 31. Fuel System
 - 32. Baggage Area
 - 33. Rudder and Brake Systems
 - 34. Flap Actuation Systems
 - 35. Upper Forward Fuselage
 - 36. Aileron & Elevator Systems
 - 37. Roll Over Structure

FINISHING KIT
 - 38. Canopy and Window
 - 39. Seatbacks
 - 40A. Tricycle Landing Gear & Engine Mount
 - 41. Wing Attachment
 - 42. Miscellanea
 - 45. Cowling
 - 46A. Tricycle Gear Leg & Wheel Fairings

POWER-PLANT KIT
 - 43. Engine Installation
 - 44. Spinner & Propeller
 - 47. Cowl Baffle
 - 48. Exhaust System
 - 49. Fuel & Oil System
 - 50. Control Cables

AVIONICS KIT
 - 51. Antenna Installation
 - 52. ACK ELT




0 Comments

The Journey Begins

6/8/2015

0 Comments

 
Picture
After visiting the EAA Airventure Oshkosh 2015, I continued my journey through the USA and visited the factory of Van's Aircraft in Aurora, Oregon. Ken showed me through the factory then took me on a test flight in the RV14A. 

After researching different types to build over a couple of years I had basically decided to join the Van's building fraternity and go with the RV14A. The test flight sealed the deal and I placed my order while I was there. Empenage ordered and paid for, deposit paid on Wing kit.

The journey begins. Vans Builder No.. 140239


0 Comments

    RSS Feed

    Archives

    October 2020
    September 2020
    August 2020
    July 2020
    June 2020
    May 2020
    April 2020
    May 2018
    July 2017
    May 2017
    April 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    July 2016
    June 2016
    May 2016
    March 2016
    February 2016
    January 2016
    September 2015
    August 2015

    Categories

    All
    03. Tools And Workshop
    04. Parts
    05. Construction Materials
    06. Vertical Stabiliser
    07. Rudder
    08. Horizontal Stabiliser
    09. Elevator
    10. Aft Fuselage
    11. Empennage Attachments
    12. Empennage Fairings
    13. Main Spar
    14. Wing Ribs
    15. Rear Spar
    16. Top Wing Skins
    17. Outboard Leading Edge
    18. Fuel Tank
    19. Wing Systems Routing
    20. Bottom Wing Skins
    21. Flap
    22. Aileron
    23. Aileron Actuation
    24. Wing Tip
    25. Fwd Mid Fuselage Bulkheads
    26. Mid Fuselage Lower Structure
    27. Firewall
    28. Fwd Fuselage Lower Structure
    29 Fwd-Mid Fuselage Side Structure
    30. Aft Fuselage Attachment
    31. Fuel System
    32. Baggage Area
    33. Rudder And Brake System
    34. Flap Actuation System
    35. Upper Fwd Fuselage
    36. Aileron & Elevator Systems
    37. Roll Over STructure
    38. Canopy & WIndow
    39. Seatbacks
    40A. Tricycle Landing Gear & Engine Mount
    41. Wing Attachment
    42. Miscellanea
    43. Engine Installation
    44. Spinner & Propeller
    45. Cowling
    46A. Tricycle Gear Leg & Wheel Fairing
    47. Cowl Baffle
    48. Exhaust System
    49. Fuel & Oil Systems
    50. Control Cables
    51. Antenna Installaion
    52. ACK ELT
    Aft Fueselage Kit
    Avionics Kit
    Electrical
    Empennage Kit
    Finishing Kit
    Inspections
    Miscellaneous
    OP-38. Aileron Trim
    OP-52. Landing Light
    OP-55. WIngtip Navigation Lighting
    OP-56. Tail Lighting
    Paint
    Powerplant Kit
    Priming
    Wing Kit

  • Blog
  • About
  • Contact
  • Hours
  • Helpers